The multi-generational Duo 211, a spatial wonder

Duo 211

The Hanse Haus prefabricated Duo 211 was designed as a multi-generational house and is a real spatial wonder.

The house offers not only generous space for a family with up to three children, but also a separate granny flat which can be inhabited, for example, by the grandparents.

Thanks to the ground-level arrangement of the rooms in the granny flat, it is perfectly tailored to the needs of the elderly.

Characteristics
Roof form Pitched roof, Pent roof
Roof inclinationPitched roof 25° / Pent roof 5°
Living space granny flat53,10 m²
Living space main dwelling143,52 m²
Shared area8,93 m²
Base area granny flat53,10 m²
Base area main dwelling149,07 m²
Number of floors2
Küche in einem Fertighaus von Hanse Haus
Wohnzimmer mit Couch und Tisch in einem Fertighaus von Hanse Haus

Floor plan
example

Get an impression of this house through the floor plans. We will show you our planning suggestions, which of course can be customised on request.

Duo Mehrfamilienhaus Fertighaus Planung Grundriss
Ground floor
Duo Mehrfamilienhaus Fertighaus Planung Grundriss
Upper floor

What our clients say about our houses

Hanse Haus
references
Außenansicht eines Fertighauses von Hanse Haus
References
The Volpert family

To build a second time – for a long time, the Volpert family had this wish. Not because defects had emerged in their previous Hanse Haus home. Simply that their ideas about living had changed over time.

Continue reading
Map
List

Hanse Haus consultants, show homes & planned construction projects

Find a Hanse Haus consultant and a show home near you. An excursion to a planned building project or to a customer’s house are also possible.

Filter map
Adelsried
Your contact person
  • Federle, Josef
  • Schuller, Peter

Oberes Wölfle 3, 86477 Adelsried

Opening hours: nach Vereinbarung

Houses: Villa 165

T +49 (0) 9741 808 409

.VCARD
Bad Vilbel
Your contact person
  • Kläber, Bert
  • Marquart, Toni
  • Martensson, Rune
  • Müller, Alexander
  • Voloder, Bernhard

Ludwig-Erhard-Straße Nr. 7, Nr. 8, Nr. 27, 61118 Bad Vilbel

Opening hours: Mi. - So. 11-18 Uhr

Houses: House of Inspiration (Nr. 7), Variant 169 (Nr. 8), Variant 45-175 (Nr. 27)

T +49 (0) 9741 808 409

.VCARD
Construction project
Bungalow 109 Mosbach

Building date: 05. July 2018

Construction project
Bungalow 113 Babenhausen

Building date: 30. August 2018

Construction project
Bungalow 113 Bad Kissingen-Arnshausen

Building date: 12. December 2018

Construction project
Bungalow 113 Bad Neustadt

Building date: 02. May 2019

Variant 35-154 Bad Neustadt

Building date: 24. June 2019

Construction project
Bungalow 113 Beerfelden

Building date: 22. January 2019

Construction project
Bungalow 113 Biberist (SO)

Building date: 19. June 2018

Construction project
Bungalow 113 Billigheim

Building date: 11. December 2018

Variant 35-154 Billigheim

Building date: 13. December 2018

Construction project
Bungalow 113 Creußen

Building date: 03. December 2018

Construction project
Bungalow 113 CV8 2RB; Kenilworth

Building date: 25. September 2018

Construction project
Bungalow 113 Eislingen/Fils

Building date: 06. March 2019

Construction project
Bungalow 113 Frankfurt a. M. - Höchst

Building date: 15. January 2019

Construction project
Bungalow 113 Gundelsheim

Building date: 26. November 2018

Variant 35-154 Gundelsheim

Building date: 26. June 2019

Variant 35-154 Gundelsheim

Building date: 30. October 2018

Construction project
Bungalow 113 Hannover-Badenstedt

Building date: 17. June 2019

Construction project
Bungalow 113 Henstedt-Ulzburg

Building date: 05. February 2019

Construction project
Bungalow 113 Keidelheim

Building date: 06. May 2019

Construction project
Bungalow 113 Kell am See

Building date: 20. June 2018

Construction project
Bungalow 113 Langenneufnach

Building date: 22. August 2018

Variant 35-162 Langenneufnach

Building date: 11. April 2019

Construction project
Bungalow 113 Lohfelden

Building date: 31. January 2019

Construction project
Bungalow 113 Mainbernheim

Building date: 20. May 2019

Variant 35-154 Mainbernheim

Building date: 27. March 2019

Variant 35-154 Mainbernheim

Building date: 11. April 2019

Construction project
Bungalow 113 Miltenberg

Building date: 28. May 2019

Construction project
Bungalow 113 Modautal-Neutsch

Building date: 27. February 2019

Construction project
Bungalow 113 Möhnesee-Günne

Building date: 21. January 2019

Construction project
Bungalow 113 Putbus-Lauterbach

Building date: 04. December 2018

Construction project
Bungalow 113 Sigmaringen

Building date: 09. October 2018

Construction project
Bungalow 113 Tiefenbach

Building date: 11. December 2018

Construction project
Bungalow 113 Uffenheim

Building date: 08. April 2019

Construction project
Bungalow 113 Wald-Michelbach

Building date: 21. March 2019

Construction project
Bungalow 113 Wedemark-Mellendorf

Building date: 10. December 2018

Construction project
Bungalow 113 Wülfershausen-Eichenhausen

Building date: 21. March 2019

Construction project
Bungalow 113 Zell

Building date: 26. June 2018

Construction project
Bungalow 126 Feuchtwangen/Breitenau

Building date: 17. June 2019

Construction project
Bungalow 126 Obrigheim

Building date: 25. July 2018

Construction project
Bungalow 133 Bad Brückenau

Building date: 06. May 2019

Construction project
Bungalow 80 Gerolzhofen

Building date: 02. May 2019

Variant 35-154 Gerolzhofen

Building date: 26. June 2018

Construction project
Bungalow 80 Hardthausen

Building date: 14. January 2019

Construction project
Bungalow 80 Ingenried

Building date: 22. May 2019

Construction project
Bungalow 80 Warendorf

Building date: 17. April 2019

Construction project
Cubus 134 Herzogenaurach

Building date: 26. March 2019

Construction project
Cubus 148 Linkenheim-Hochstetten

Building date: 19. March 2019

Variant 35-154 Linkenheim-Hochstetten

Building date: 06. December 2018

Villa 156 Linkenheim-Hochstetten

Building date: 18. February 2019

Construction project
Cubus 148 Neuhausen

Building date: 13. May 2019

Construction project
Cubus 167 Cadolzburg

Building date: 04. March 2019

Construction project
Cubus 167 Hohendubrau-Gebelzig

Building date: 12. March 2019

Construction project
Cubus 167 Reilingen

Building date: 20. November 2018

Variant 35-154 Reilingen

Building date: 12. September 2018

Variant 35-154 Reilingen

Building date: 11. December 2018

Construction project
Cubus 183 Jülich Mersch

Building date: 11. June 2019

Construction project
Cubus 183 Ketsch

Building date: 27. November 2018

Doppelhaus 35-176 Ketsch

Building date: 24. April 2019

Construction project
Cubus 183 Münsingen-Auingen

Building date: 10. July 2018

Construction project
Cubus 183 Neuss

Building date: 04. December 2018

Construction project
Cubus 183 Scheidgen

Building date: 25. September 2018

Construction project
Dh Sonder Gessertshausen-Deubach

Building date: 24. April 2019

Construction project
Dh Sonder Mannheim/Seckenheim

Building date: 03. December 2018

Construction project
Dh Sonder Sindelfingen

Building date: 29. April 2019

Construction project
Doppelhaus 130 Altensteig-Walddorf

Building date: 27. May 2019

Construction project
Doppelhaus 130 Hechendorf

Building date: 16. January 2019

Villa 183 Seefeld-Hechendorf

Building date: 21. August 2018

Construction project
Doppelhaus 130 Maisach-Malching

Building date: 24. July 2018

Doppelhaus 35-176 Maisach - Malching

Building date: 24. July 2018

Construction project
Doppelhaus 130 Mering

Building date: 07. March 2019

Construction project
Doppelhaus 131 Berlin-Tempelhof-Schöneberg

Building date: 23. April 2019

Doppelhaus 131 Berlin-Tempelhof-Schöneberg

Building date: 23. April 2019

Construction project
Doppelhaus 131 Gevelsberg

Building date: 11. February 2019

Doppelhaus 131 Gevelsberg

Building date: 11. February 2019

Construction project
Doppelhaus 139 Fürstenfeldbruck

Building date: 03. July 2018

Doppelhaus 35-130 Fürstenfeldbruck

Building date: 03. July 2018

Villa 134 Fürstenfeldbruck

Building date: 19. June 2018

Construction project
Doppelhaus 139 Ilvesheim

Building date: 27. November 2018

Construction project
Doppelhaus 139 Singen

Building date: 12. March 2019

Doppelhaus 139 Singen

Building date: 12. March 2019

Construction project
Doppelhaus 139 Tönisvorst

Building date: 21. February 2019

Sonder Tönisvorst

Building date: 11. February 2019

Construction project
Doppelhaus 144 Eppstein

Building date: 21. August 2018

Doppelhaus 144 Eppstein

Building date: 23. October 2018

Vita 143 Eppstein

Building date: 04. July 2018

Construction project
Doppelhaus 144 Hofheim-Marxheim

Building date: 12. February 2019

Construction project
Doppelhaus 176 Ergolding

Building date: 10. April 2019

Construction project
Doppelhaus 176 Heusenstamm

Building date: 28. January 2019

Doppelhaus 176 Heusenstamm

Building date: 28. January 2019

Variant 35-154 Heusenstamm

Building date: 12. February 2019

Construction project
Doppelhaus 25-125 Egelsbach

Building date: 06. May 2019

Doppelhaus 25-125 Egelsbach

Building date: 06. May 2019

Construction project
Doppelhaus 25-125 Kirchhain

Building date: 27. November 2018

Variant 35-162 Kirchhain

Building date: 22. May 2019

Construction project
Doppelhaus 25-125 Lambsheim

Building date: 20. August 2018

Construction project
Doppelhaus 35-130 Habichtswald-Ehlen

Building date: 04. March 2019

Doppelhaus 35-130 Habichtswald-Ehlen

Building date: 04. March 2019

Construction project
Doppelhaus 35-130 Mühlhausen

Building date: 27. March 2019

Doppelhaus 35-130 Mühlhausen

Building date: 04. October 2018

Construction project
Doppelhaus 35-130 Pähl

Building date: 09. April 2019

Doppelhaus 35-130 Pähl

Building date: 09. April 2019

Construction project
Doppelhaus 35-176 Altlußheim

Building date: 28. May 2019

Construction project
Doppelhaus 35-176 Neu-Isenburg

Building date: 18. February 2019

Variant 35-154 Neu-Isenburg

Building date: 26. June 2019

Construction project
Doppelhaus 35-176 Obergruppenbach

Building date: 08. April 2019

Doppelhaus 35-176 Obergruppenbach

Building date: 08. April 2019

Construction project
Doppelhaus 35-176 Taunusstein-Wehen

Building date: 24. September 2018

Variant 35-154 Taunusstein-Wehen

Building date: 19. February 2019

Variant 35-154 Taunusstein-Wehen

Building date: 04. September 2018

Variant 35-154 Taunusstein-Wehen

Building date: 10. September 2018

Variant 35-154 Taunusstein-Wehen

Building date: 17. September 2018

Variant 35-154 Taunusstein-Wehen

Building date: 08. October 2018

Construction project
Duo 315 Ötigheim

Building date: 14. August 2018

Variant 35-154 Ötigheim

Building date: 28. August 2018

Construction project
Duo 315 Weibern

Building date: 09. July 2018

Estenfeld
Your contact person
  • Deppisch, Klaus
  • Flick, Hanns Peter

Otto-Hahn-Str. 12, 97230 Estenfeld

Opening hours: täglich 11-18 Uhr

Houses: Variant 172

T +49 (0) 9741 808 409

.VCARD
Fellbach
Your contact person
  • Bernhart, Cornelia
  • Mineur, Yves
  • Rentsch, Holger
  • Rosenberger, Michael
  • Stübbe, Karl

Höhenstraße 21 / Hs. 26 und Hs. 30, 70736 Fellbach

Opening hours: Mi. - So. 11-18 Uhr

Houses: Variant 25-198 (Nr. 30), Variant 35-173 (Nr. 26)

T +49 (0) 9741 808 409

.VCARD
Günzburg
Your contact person
  • Gaschler, Carmen
  • Lesche, Eberhard
  • Michalek, Lukas

Kimmerle-Ring 2 / Hs. 13, 89312 Günzburg

Opening hours: Mi. - So. 11-18 Uhr

Houses: Variant 35-172

T +49 (0) 9741 808 409

.VCARD
Habichtswald
Your contact person
  • Ghazarian, Patrick

Himmelsborn 1, 34317 Habichtswald

Opening hours: nach Vereinbarung

Houses: Doppelhaus 35-130

T +49 (0) 9741 808 409

.VCARD
Hanse Haus Bauherrenzentrum & Musterhauspark Oberleichtersbach
Your contact person
  • Hohn, Gerd
  • Oftring, Patrick
  • Pawellek, Detlef
  • Schulte, Matthias
  • Zeitz, Steffen

Buchstraße 3, 97789 Buchrasen

Opening hours: Mo.-Fr. 12-17 Uhr und Sa.+So. 11-17 Uhr

Houses: Vita 147, Bungalow 133, Variant 45-192, Variant 35-154, Villa 178, Archidomus, Colani Haus

T +49 (0) 9741 808 409

.VCARD
Heßdorf
Your contact person
  • Bornkessel, Oliver
  • Klapp, Markus

Im Gewerbepark 30n, 91093 Heßdorf

Opening hours: Mi. - So. 11-18 Uhr

Houses: Variant 275

T +49 (0) 9741 808 409

.VCARD
Köln-Frechen
Your contact person
  • Decker, Frank
  • Ems, Oliver
  • Florén-Sinzig, Wilfried
  • Roggendorf, Holger
  • Sinzig, Elke

Europaallee 45, Parzelle 21, 50226 Köln-Frechen

Opening hours: Mi. - So. 11-18 Uhr

Houses: Villa 165

T +49 (0) 9741 808 409

.VCARD
Langenhagen
Your contact person
  • Burmeister, Thomas
  • Eiben, Albert
  • Gratz, Guido
  • Linz, Matthias
  • Pfundheller, Gerd

Münchner Straße 25 S, 30855 Langenhagen

Opening hours: Mi. - So. 11-18 Uhr

Houses: Classica

T +49 (0) 9741 808 409

.VCARD
Mannheim
Your contact person
  • Hamberger, Jürgen
  • Henter, Edgar
  • Reiter, Uwe
  • Schleyer, Pius

Xaver-Fuhr-Straße 111/31 und 111/33, 68163 Mannheim

Opening hours: Di. - So. 10-17 Uhr

Houses: Vivario (Nr. 31), Variant 35-161 (Nr. 33)

T +49 (0) 9741 808 409

.VCARD
Mülheim-Kärlich
Your contact person
  • Schmitz, Alexander
  • Westphalen, Edmund

Musterhausstraße 113, 56218 Mülheim-Kärlich

Opening hours: Mi. - So. 11-17 Uhr

Houses: Variant 35-174

T +49 (0) 9741 808 409

.VCARD
München-Poing
Your contact person
  • Fell, Markus
  • Hamm, Dieter
  • Herrmann, Michael
  • Schaede, Tobias

Senator-Gerauer-Str. 25 / Platz 35 und M1, 85586 Poing

Opening hours: Di. - So. 10-17 Uhr

Houses: Variant 25-192 (Platz 35), Doppelhaus (22° Walmdach) (M1)

T +49 (0) 9741 808 409

.VCARD
Offenburg
Your contact person
  • Münzer, Brigitte
  • Niemann, Armin

Am Messeplatz / Fertighausgelände, 77656 Offenburg

Opening hours: Mi. - So. 11-17 Uhr

Houses: Villa 189

T +49 (0) 9741 808 409

.VCARD
Construction project
Patrizia Alzey

Building date: 18. September 2018

Construction project
Sonder Aberystwyth; SY23 3LL

Building date: 12. March 2019

Construction project
Sonder Berchem

Building date: 28. August 2018

Construction project
Sonder Gifhorn

Building date: 18. March 2019

Construction project
Sonder GY4 6RN; St. Martin; Guernsey

Building date: 18. September 2018

Construction project
Sonder GY7 9UJ; St. Savior; Guernsey

Building date: 22. January 2019

Construction project
Sonder Oberleichtersbach

Building date: 02. October 2018

Construction project
Sonder Polzeath, Wadebridge, PL27 6TP

Building date: 11. September 2018

Construction project
Sonder Runnymede, KT13 8YB

Building date: 25. June 2019

Construction project
Sonder St. Martin, GY4 6BB Guernsey

Building date: 17. July 2018

Construction project
Sonder Willanzheim

Building date: 29. January 2019

Suhr
Your contact person
  • Bachmann, Marc
  • Biehler-Ruch, Anita

Bernstrasse Ost 46, 5034 Suhr

Opening hours: Mi. - So. 11-18 Uhr

Houses: Cubus 162

T +49 (0) 9741 808 409

.VCARD
Construction project
Variant 169 Arnstadt

Building date: 05. March 2019

Construction project
Variant 169 Bad Brückenau-Wernarz

Building date: 15. January 2019

Construction project
Variant 169 Börtlingen

Building date: 23. July 2018

Construction project
Variant 169 Brühl

Building date: 26. June 2018

Construction project
Variant 169 Frankfurt-Bonames

Building date: 06. February 2019

Construction project
Variant 169 Frankfurt-Seckbach

Building date: 14. January 2019

Construction project
Variant 169 Hettstadt

Building date: 26. November 2018

Construction project
Variant 169 Hochheim

Building date: 15. January 2019

Construction project
Variant 169 Jestetten-Altenburg

Building date: 09. April 2019

Construction project
Variant 169 Keispelt

Building date: 03. July 2018

Construction project
Variant 169 Königswinter

Building date: 04. December 2018

Construction project
Variant 169 Maintal

Building date: 26. September 2018

Construction project
Variant 169 Michelbach an der Bilz

Building date: 19. June 2018

Construction project
Variant 169 Monheim

Building date: 19. June 2018

Construction project
Variant 169 Montabaur

Building date: 04. June 2019

Construction project
Variant 169 Mühlhausen-Rettigheim

Building date: 25. February 2019

Construction project
Variant 169 Münster

Building date: 14. August 2018

Variant 35-154 Münster

Building date: 11. September 2018

Construction project
Variant 169 Nidderau-Heldenbergen

Building date: 23. October 2018

Construction project
Variant 169 Weilheim i. OB

Building date: 05. November 2018

Construction project
Variant 170 Kraichtal

Building date: 04. September 2018

Variant 35-154 Kraichtal

Building date: 01. October 2018

Variant 35-154 Kraichtal

Building date: 13. February 2019

Variant 35-173 Kraichtal

Building date: 20. March 2019

Construction project
Variant 25-135 Bad Rappenau - Zimmerhof

Building date: 08. November 2018

Construction project
Variant 25-135 Gingen a. d. Fils

Building date: 29. November 2018

Construction project
Variant 25-135 Kehl

Building date: 21. November 2018

Construction project
Variant 25-135 Remmingsheim

Building date: 24. January 2019

Construction project
Variant 25-135 Rorbas

Building date: 23. April 2019

Construction project
Variant 25-150 Aiglsbach

Building date: 16. July 2018

Construction project
Variant 25-150 Aschau im Chiemgau

Building date: 15. October 2018

Construction project
Variant 25-150 Aurigeno (TI)

Building date: 02. October 2018

Construction project
Variant 25-150 Baierbach

Building date: 16. August 2018

Construction project
Variant 25-150 Berlin - Alt-Hohenschönhausen

Building date: 29. January 2019

Construction project
Variant 25-150 Butzbach / Hoch-Weisel

Building date: 02. July 2018

Construction project
Variant 25-150 Dombühl

Building date: 23. January 2019

Construction project
Variant 25-150 Ehningen

Building date: 04. July 2018

Construction project
Variant 25-150 Einhausen/Groß-Hausen

Building date: 31. January 2019

Construction project
Variant 25-150 Empfingen

Building date: 30. January 2019

Construction project
Variant 25-150 Heroldsbach

Building date: 10. January 2019

Construction project
Variant 25-150 Himmelstadt

Building date: 18. June 2019

Construction project
Variant 25-150 Hohenfurch

Building date: 16. May 2019

Construction project
Variant 25-150 Iphofen-Nenzenheim

Building date: 12. December 2018

Construction project
Variant 25-150 Kirchdorf

Building date: 22. October 2018

Construction project
Variant 25-150 Köln

Building date: 29. November 2018

Construction project
Variant 25-150 Leipzig

Building date: 06. December 2018

Construction project
Variant 25-150 Lenningen

Building date: 20. February 2019

Construction project
Variant 25-150 Markt Bibart-Altmannshausen

Building date: 04. February 2019

Construction project
Variant 25-150 Nauheim

Building date: 14. May 2019

Construction project
Variant 25-150 Neuhofen

Building date: 26. July 2018

Construction project
Variant 25-150 Rennertshofen

Building date: 14. February 2019

Variant 35-154 Rennertshofen

Building date: 05. February 2019

Villa 183 Rennertshofen

Building date: 25. June 2018

Construction project
Variant 25-150 Röthenbach

Building date: 09. January 2019

Construction project
Variant 25-150 Sersheim

Building date: 29. April 2019

Variant 25-183 Sersheim

Building date: 12. July 2018

Construction project
Variant 25-150 Vettweiß-Kelz

Building date: 18. June 2018

Construction project
Variant 25-150 Wittlich

Building date: 18. March 2019

Variant 35-154 Wittlich

Building date: 14. November 2018

Construction project
Variant 25-165 Altomünster

Building date: 14. May 2019

Construction project
Variant 25-165 Bad Neustadt-Herschfeld

Building date: 10. October 2018

Construction project
Variant 25-165 Feuchtwangen

Building date: 12. June 2019

Construction project
Variant 25-165 Fulda

Building date: 25. June 2018

Construction project
Variant 25-165 Gengenbach-Reichenbach

Building date: 11. April 2019

Variant 35-154 Gengenbach-Reichenbach

Building date: 13. March 2019

Construction project
Variant 25-165 Herrenberg-Oberjesingen

Building date: 21. August 2018

Variant 25-166 Herrenberg-Oberjesingen

Building date: 05. September 2018

Construction project
Variant 25-165 Hohen Neuendorf

Building date: 04. February 2019

Construction project
Variant 25-165 Mögglingen

Building date: 17. October 2018

Construction project
Variant 25-165 Oberkochen

Building date: 16. August 2018

Construction project
Variant 25-165 Schöntal-Oberkessach

Building date: 20. June 2018

Construction project
Variant 25-166 Birkenfeld-Gräfenhausen

Building date: 27. June 2018

Construction project
Variant 25-166 Brechen

Building date: 05. November 2018

Construction project
Variant 25-166 Burgwallbach

Building date: 18. March 2019

Construction project
Variant 25-166 Eurasburg

Building date: 07. February 2019

Construction project
Variant 25-166 Faßberg-Müden

Building date: 18. June 2019

Construction project
Variant 25-166 Groß-Rohrheim

Building date: 11. June 2019

Construction project
Variant 25-166 Kastellaun

Building date: 27. February 2019

Villa 183 Kastellaun

Building date: 09. October 2018

Construction project
Variant 25-166 Langenselbold

Building date: 05. March 2019

Variant 35-154 Langenselbold

Building date: 08. January 2019

Variant 45-175 Langenselbold

Building date: 11. October 2018

Construction project
Variant 25-166 Nidda

Building date: 13. June 2019

Construction project
Variant 25-166 Rohr

Building date: 20. February 2019

Construction project
Variant 25-166 Schwäbisch Gmünd

Building date: 23. May 2019

Construction project
Variant 25-166 Sinzig

Building date: 14. January 2019

Construction project
Variant 25-166 Thalfang-Bäsch

Building date: 13. February 2019

Construction project
Variant 25-166 Vettweiß

Building date: 29. April 2019

Construction project
Variant 25-183 Altenriet

Building date: 16. October 2018

Construction project
Variant 25-183 Bad Hersfeld

Building date: 10. April 2019

Construction project
Variant 25-183 Bingen

Building date: 26. February 2019

Construction project
Variant 25-183 Burghausen

Building date: 08. May 2019

Construction project
Variant 25-183 Endingen

Building date: 13. June 2019

Construction project
Variant 25-183 Gauersheim

Building date: 05. September 2018

Construction project
Variant 25-183 Gersfeld

Building date: 11. March 2019

Construction project
Variant 25-183 Grünstadt

Building date: 02. May 2019

Variant 35-154 Grünstadt

Building date: 22. November 2018

Construction project
Variant 25-183 Hannover-Bothfeld

Building date: 28. November 2018

Construction project
Variant 25-183 Höchstadt-Etzelskirchen

Building date: 27. September 2018

Construction project
Variant 25-183 Holzkirchen-Hartpenning

Building date: 20. November 2018

Construction project
Variant 25-183 Karlshuld

Building date: 12. February 2019

Construction project
Variant 25-183 Lahr-Kippenheimweiler

Building date: 17. July 2018

Construction project
Variant 25-183 Limbach

Building date: 04. July 2018

Construction project
Variant 25-183 Mörnsheim-Haunsfeld

Building date: 20. June 2018

Construction project
Variant 25-183 Neustadt a.d. Aisch

Building date: 08. January 2019

Villa 183 Neustadt a.d. Aisch

Building date: 28. August 2018

Construction project
Variant 25-183 Niederroth

Building date: 24. January 2019

Construction project
Variant 25-183 Obersulm-Weiler

Building date: 05. December 2018

Construction project
Variant 25-183 Odenthal

Building date: 27. May 2019

Variant 35-154 Odenthal

Building date: 17. April 2019

Construction project
Variant 25-183 Oxfordshire, OX7 5YF

Building date: 06. November 2018

Construction project
Variant 25-183 Prangins (VD)

Building date: 07. May 2019

Construction project
Variant 25-183 Schellerten-Wendhausen

Building date: 13. February 2019

Construction project
Variant 25-183 Solingen

Building date: 10. October 2018

Construction project
Variant 25-183 Walldürn

Building date: 28. May 2019

Variant 35-154 Walldürn

Building date: 11. June 2019

Variant 35-173 Walldürn

Building date: 11. December 2018

Construction project
Variant 25-183 Zeitlofs-Weißenbach

Building date: 04. December 2018

Construction project
Variant 25-192 Adelshofen

Building date: 13. June 2019

Construction project
Variant 25-192 Flörsheim-Dalsheim

Building date: 18. February 2019

Construction project
Variant 25-192 Kirchdorf

Building date: 27. September 2018

Construction project
Variant 25-192 Oberau

Building date: 14. May 2019

Construction project
Variant 25-192 Tapfheim

Building date: 07. January 2019

Construction project
Variant 25-192 Vöhringen-Illerberg

Building date: 03. April 2019

Construction project
Variant 275 Breitengüßbach

Building date: 30. July 2018

Construction project
Variant 275 Heinersreuth

Building date: 05. February 2019

Construction project
Variant 35-137 Bad Honnef-Aegidienberg

Building date: 27. May 2019

Construction project
Variant 35-137 Effingen

Building date: 18. June 2019

Construction project
Variant 35-137 Großbardorf

Building date: 10. January 2019

Construction project
Variant 35-137 Hamm

Building date: 20. November 2018

Construction project
Variant 35-137 Hohenstein-Breithardt

Building date: 16. May 2019

Construction project
Variant 35-137 Kürten

Building date: 27. May 2019

Construction project
Variant 35-137 Lampertheim

Building date: 13. August 2018

Construction project
Variant 35-137 Langsur

Building date: 13. November 2018

Construction project
Variant 35-137 Lautertal

Building date: 23. May 2019

Construction project
Variant 35-137 Markranstädt-Seebenisch

Building date: 22. May 2019

Construction project
Variant 35-137 Neubulach

Building date: 06. June 2019

Construction project
Variant 35-137 Pulheim

Building date: 25. April 2019

Construction project
Variant 35-137 Raubling

Building date: 23. July 2018

Construction project
Variant 35-137 Sinsheim

Building date: 16. August 2018

Construction project
Variant 35-137 Vilgertshofen-Issing

Building date: 11. September 2018

Variant 35-137 Vilgertshofen-Issing

Building date: 11. September 2018

Construction project
Variant 35-152 Ober-Flörsheim

Building date: 14. March 2019

Construction project
Variant 35-153 Bischofsheim

Building date: 28. March 2019

Construction project
Variant 35-153 Bogel

Building date: 14. March 2019

Construction project
Variant 35-153 Klausen

Building date: 11. October 2018

Construction project
Variant 35-153 Königswinter-Uthweiler

Building date: 29. August 2018

Construction project
Variant 35-153 Leibstadt (AG)

Building date: 30. October 2018

Construction project
Variant 35-153 Mönchengladbach

Building date: 22. November 2018

Construction project
Variant 35-153 Swisttal-Heimerzheim

Building date: 27. June 2018

Construction project
Variant 35-154 Adelschlag-Ochsenfeld

Building date: 30. October 2018

Construction project
Variant 35-154 Algermissen

Building date: 11. April 2019

Construction project
Variant 35-154 Allendorf a. d. Lumda

Building date: 21. February 2019

Construction project
Variant 35-154 Altusried-Frauenzell

Building date: 14. November 2018

Construction project
Variant 35-154 Arnsberg

Building date: 07. November 2018

Construction project
Variant 35-154 Augsburg

Building date: 09. January 2019

Construction project
Variant 35-154 Baar-Ebenhausen

Building date: 24. October 2018

Construction project
Variant 35-154 Bad Brückenau-Volkers

Building date: 27. May 2019

Construction project
Variant 35-154 Bad Honnef

Building date: 08. November 2018

Construction project
Variant 35-154 Bad Münstereifel

Building date: 14. August 2018

Construction project
Variant 35-154 Bad Münstereifel-Kirspenich

Building date: 13. December 2018

Construction project
Variant 35-154 Bad Rappenau-Babstadt

Building date: 18. March 2019

Construction project
Variant 35-154 Bad Säckingen

Building date: 03. September 2018

Construction project
Variant 35-154 Bad Schönborn-Langenbrücken

Building date: 27. February 2019

Construction project
Variant 35-154 Balzfeld

Building date: 29. October 2018

Construction project
Variant 35-154 Berlin-Lichtenrade

Building date: 24. January 2019

Construction project
Variant 35-154 Böhl-Iggelheim

Building date: 17. October 2018

Construction project
Variant 35-154 Böhmenkirch

Building date: 16. October 2018

Construction project
Variant 35-154 Bonstetten

Building date: 15. November 2018

Variant 35-154 Bonstetten

Building date: 17. December 2018

Villa 156 Bonstetten

Building date: 07. May 2019

Construction project
Variant 35-154 Boxberg

Building date: 06. December 2018

Construction project
Variant 35-154 Brandenburg an der Havel

Building date: 27. November 2018

Construction project
Variant 35-154 Brombachtal

Building date: 05. November 2018

Construction project
Variant 35-154 Buch

Building date: 25. March 2019

Variant 35-154 Buch

Building date: 08. April 2019

Construction project
Variant 35-154 Buggingen

Building date: 21. November 2018

Construction project
Variant 35-154 Burgbernheim

Building date: 18. February 2019

Villa 142 Burgbernheim

Building date: 17. July 2018

Construction project
Variant 35-154 Burgebrach

Building date: 06. February 2019

Construction project
Variant 35-154 Burglengenfeld

Building date: 28. November 2018

Construction project
Variant 35-154 Burgsinn

Building date: 13. September 2018

Construction project
Variant 35-154 Burscheid

Building date: 25. April 2019

Construction project
Variant 35-154 Butzbach

Building date: 05. November 2018

Variant 35-154 Butzbach

Building date: 08. January 2019

Construction project
Variant 35-154 Calw-Heumaden

Building date: 26. February 2019

Construction project
Variant 35-154 Dentlein am Forst

Building date: 02. April 2019

Construction project
Variant 35-154 Dernbach

Building date: 19. July 2018

Construction project
Variant 35-154 Dielheim-Balzfeld

Building date: 19. February 2019

Variant 35-154 Dielheim-Balzfeld

Building date: 17. December 2018

Construction project
Variant 35-154 Dingolshausen

Building date: 10. January 2019

Construction project
Variant 35-154 Dinslaken

Building date: 16. August 2018

Construction project
Variant 35-154 Dirmstein

Building date: 20. November 2018

Construction project
Variant 35-154 Donauwörth-Riedlingen

Building date: 27. June 2018

Construction project
Variant 35-154 Dornholzhausen

Building date: 30. October 2018

Construction project
Variant 35-154 Durchhausen

Building date: 12. November 2018

Construction project
Variant 35-154 Düren-Derichsweiler

Building date: 10. April 2019

Construction project
Variant 35-154 Dürrwangen

Building date: 25. October 2018

Construction project
Variant 35-154 Ebersburg-Ried

Building date: 30. January 2019

Construction project
Variant 35-154 Ebersburg-Weyhers

Building date: 28. August 2018

Construction project
Variant 35-154 Ehrenkirchen - Kirchhofen

Building date: 07. November 2018

Construction project
Variant 35-154 Eichenzell-Rothemann

Building date: 16. July 2018

Construction project
Variant 35-154 Elsdorf

Building date: 22. May 2019

Construction project
Variant 35-154 Emmingen-Liptingen

Building date: 19. November 2018

Construction project
Variant 35-154 Ennepetal

Building date: 04. April 2019

Construction project
Variant 35-154 Eppingen

Building date: 11. June 2019

Variant 35-154 Eppingen-Elsenz

Building date: 16. April 2019

Construction project
Variant 35-154 Erolzheim

Building date: 16. January 2019

Construction project
Variant 35-154 Estenfeld

Building date: 08. October 2018

Construction project
Variant 35-154 Fellbach

Building date: 18. September 2018

Construction project
Variant 35-154 Fischach-Willmatshofen

Building date: 06. February 2019

Construction project
Variant 35-154 Fischbachau

Building date: 10. September 2018

Construction project
Variant 35-154 Florstadt-Stammheim

Building date: 29. November 2018

Construction project
Variant 35-154 Fulda

Building date: 20. May 2019

Construction project
Variant 35-154 Fulda-Johannesberg

Building date: 18. July 2018

Construction project
Variant 35-154 Gabsheim

Building date: 05. July 2018

Construction project
Variant 35-154 Garching a.d.Alz

Building date: 06. November 2018

Construction project
Variant 35-154 Gerbershausen

Building date: 11. July 2018

Construction project
Variant 35-154 Gerolstein-Lissingen

Building date: 17. September 2018

Construction project
Variant 35-154 Gönnheim

Building date: 04. October 2018

Construction project
Variant 35-154 Graben-Neudorf

Building date: 05. March 2019

Construction project
Variant 35-154 Gräfenberg

Building date: 18. June 2018

Construction project
Variant 35-154 Gremheim

Building date: 17. October 2018

Construction project
Variant 35-154 Gröbenzell

Building date: 23. April 2019

Variant 35-154 Gröbenzell

Building date: 23. April 2019

Construction project
Variant 35-154 Großeibstadt

Building date: 20. September 2018

Construction project
Variant 35-154 Großrinderfeld

Building date: 15. November 2018

Construction project
Variant 35-154 Gundelsheim

Building date: 03. June 2019

Construction project
Variant 35-154 Hainburg

Building date: 19. September 2018

Villa 167 Hainburg

Building date: 27. March 2019

Construction project
Variant 35-154 Hallerndorf

Building date: 29. January 2019

Construction project
Variant 35-154 Harsefeld

Building date: 25. March 2019

Construction project
Variant 35-154 Hattingen

Building date: 04. April 2019

Construction project
Variant 35-154 Haundorf

Building date: 16. January 2019

Construction project
Variant 35-154 Havixbeck

Building date: 17. April 2019

Construction project
Variant 35-154 Heidelberg

Building date: 26. March 2019

Variant 35-154 Heidelberg

Building date: 05. July 2018

Construction project
Variant 35-154 Heidenrod-Grebenroth

Building date: 15. November 2018

Construction project
Variant 35-154 Heimsheim

Building date: 28. June 2018

Construction project
Variant 35-154 Helmstadt-Bargen

Building date: 14. November 2018

Variant 35-154 Helmstadt-Bargen

Building date: 05. December 2018

Construction project
Variant 35-154 Hettenleidelheim

Building date: 09. October 2018

Construction project
Variant 35-154 Hetzerath

Building date: 30. October 2018

Construction project
Variant 35-154 Hochdorf

Building date: 13. May 2019

Construction project
Variant 35-154 Höchstadt-Kieferndorf

Building date: 18. October 2018

Construction project
Variant 35-154 Hosenfeld-Hainzell

Building date: 13. August 2018

Construction project
Variant 35-154 Immendingen-Hattingen

Building date: 06. February 2019

Construction project
Variant 35-154 Isny

Building date: 27. February 2019

Construction project
Variant 35-154 Itzgrund-Kaltenbrunn

Building date: 22. August 2018

Construction project
Variant 35-154 Jüchen-Bedburdyck

Building date: 19. November 2018

Construction project
Variant 35-154 Jülich

Building date: 26. September 2018

Construction project
Variant 35-154 Kalletal

Building date: 14. February 2019

Construction project
Variant 35-154 Kallstadt

Building date: 17. October 2018

Construction project
Variant 35-154 Karlsdorf-Neuthard

Building date: 06. March 2019

Construction project
Variant 35-154 Kerpen

Building date: 19. November 2018

Construction project
Variant 35-154 Kobern-Gondorf

Building date: 31. January 2019

Construction project
Variant 35-154 Kohlberg

Building date: 22. January 2019

Construction project
Variant 35-154 Königswinter-Thomasberg

Building date: 30. August 2018

Variant 35-154 Königswinter-Thomasberg

Building date: 05. November 2018

Construction project
Variant 35-154 Kupferzell

Building date: 17. April 2019

Construction project
Variant 35-154 Langenbrettach-Langenbeutingen

Building date: 02. May 2019

Construction project
Variant 35-154 Lauterbach-Frischborn

Building date: 01. October 2018

Construction project
Variant 35-154 Lichtenwald

Building date: 22. November 2018

Construction project
Variant 35-154 Marksteinach

Building date: 19. July 2018

Construction project
Variant 35-154 Marl

Building date: 29. August 2018

Construction project
Variant 35-154 Mechernich-Eiserfey

Building date: 14. November 2018

Construction project
Variant 35-154 Meckesheim

Building date: 04. October 2018

Construction project
Variant 35-154 Mering

Building date: 15. May 2019

Variant 35-154 Mering

Building date: 02. May 2019

Construction project
Variant 35-154 Mettmann-Metzkausen

Building date: 12. December 2018

Construction project
Variant 35-154 Mömbris-Heimbach

Building date: 13. March 2019

Construction project
Variant 35-154 Monsheim

Building date: 06. September 2018

Construction project
Variant 35-154 Moos

Building date: 12. December 2018

Construction project
Variant 35-154 Mötzingen

Building date: 23. January 2019

Construction project
Variant 35-154 Much

Building date: 19. February 2019

Variant 35-154 Much

Building date: 30. October 2018

Construction project
Variant 35-154 Mudau

Building date: 25. July 2018

Construction project
Variant 35-154 Mühlhausen-Ehingen

Building date: 26. September 2018

Construction project
Variant 35-154 Münchweiler

Building date: 18. September 2018

Construction project
Variant 35-154 Nassau

Building date: 12. September 2018

Construction project
Variant 35-154 Nauen

Building date: 12. September 2018

Construction project
Variant 35-154 Neckarsteinach-Neckarhausen

Building date: 24. September 2018

Construction project
Variant 35-154 Neckarwestheim

Building date: 26. March 2019

Variant 35-154 Neckarwestheim

Building date: 26. March 2019

Construction project
Variant 35-154 Neu-Ulm

Building date: 28. May 2019

Construction project
Variant 35-154 Neuhof-Rommerz

Building date: 18. July 2018

Construction project
Variant 35-154 Neulingen-Göbrichen

Building date: 23. January 2019

Construction project
Variant 35-154 Neusäß-Steppach

Building date: 03. July 2018

Construction project
Variant 35-154 Neustadt-Haardt

Building date: 16. October 2018

Construction project
Variant 35-154 Nidderau-Ostheim

Building date: 15. April 2019

Construction project
Variant 35-154 Nürtingen

Building date: 30. January 2019

Construction project
Variant 35-154 Oberderdingen

Building date: 28. February 2019

Variant 35-154 Oberderdingen

Building date: 02. May 2019

Villa 183 Oberderdingen

Building date: 02. April 2019

Construction project
Variant 35-154 Oberelsbach

Building date: 23. October 2018

Construction project
Variant 35-154 Oberkrämer OT Vehlefanz

Building date: 05. February 2019

Construction project
Variant 35-154 Oer-Erkenschwick

Building date: 21. February 2019

Construction project
Variant 35-154 Oppenheim

Building date: 20. February 2019

Construction project
Variant 35-154 Oppenweiler

Building date: 13. September 2018

Construction project
Variant 35-154 Osterburken

Building date: 01. August 2018

Construction project
Variant 35-154 Pentenried

Building date: 08. October 2018

Construction project
Variant 35-154 Petersberg

Building date: 28. June 2018

Construction project
Variant 35-154 Petersberg-Marbach

Building date: 01. October 2018

Variant 35-154 Petersberg-Marbach

Building date: 04. October 2018

Construction project
Variant 35-154 Pforzheim

Building date: 02. April 2019

Construction project
Variant 35-154 Pfungstadt

Building date: 20. August 2018

Construction project
Variant 35-154 Pinneberg

Building date: 05. March 2019

Construction project
Variant 35-154 Pinzberg

Building date: 28. January 2019

Construction project
Variant 35-154 Pleckhausen

Building date: 04. July 2018

Construction project
Variant 35-154 Polling

Building date: 22. January 2019

Construction project
Variant 35-154 Polling-Oderding

Building date: 15. May 2019

Construction project
Variant 35-154 Radevormwald

Building date: 13. March 2019

Construction project
Variant 35-154 Rauenberg

Building date: 08. May 2019

Construction project
Variant 35-154 Ravenstein-Hüngheim

Building date: 03. December 2018

Construction project
Variant 35-154 Retzstadt

Building date: 22. October 2018

Construction project
Variant 35-154 Rielasingen-Worblingen

Building date: 03. June 2019

Villa 183 Rielasingen-Worblingen

Building date: 21. May 2019

Construction project
Variant 35-154 Riesweiler

Building date: 25. October 2018

Construction project
Variant 35-154 Rimpar-Maidbronn

Building date: 15. May 2019

Construction project
Variant 35-154 Rückersdorf

Building date: 27. June 2018

Construction project
Variant 35-154 Rüdersdorf-Hennickendorf

Building date: 16. January 2019

Construction project
Variant 35-154 Ruppertshofen

Building date: 28. February 2019

Construction project
Variant 35-154 Sachsenheim

Building date: 01. April 2019

Construction project
Variant 35-154 Sandberg-Waldberg

Building date: 12. November 2018

Construction project
Variant 35-154 Sauldorf

Building date: 19. September 2018

Construction project
Variant 35-154 Scheeßel

Building date: 25. September 2018

Construction project
Variant 35-154 Schiltberg

Building date: 25. June 2019

Variant 35-154 Schiltberg

Building date: 13. March 2019

Construction project
Variant 35-154 Schmelz

Building date: 22. May 2019

Construction project
Variant 35-154 Schrozberg

Building date: 09. January 2019

Construction project
Variant 35-154 Schwabenheim an der Selz

Building date: 03. September 2018

Construction project
Variant 35-154 Schwäbisch Gmünd

Building date: 21. November 2018

Construction project
Variant 35-154 Schwabmünchen

Building date: 21. January 2019

Construction project
Variant 35-154 Schwalmtal-Brauerschwend

Building date: 27. March 2019

Construction project
Variant 35-154 Schwarzenbek

Building date: 06. November 2018

Construction project
Variant 35-154 Siegelsbach

Building date: 18. October 2018

Construction project
Variant 35-154 St. Goar-Werlau

Building date: 21. November 2018

Construction project
Variant 35-154 St. Peter

Building date: 20. September 2018

Construction project
Variant 35-154 St. Saviour, Guernsey

Building date: 28. January 2019

Construction project
Variant 35-154 Stein a. d. Traun

Building date: 13. May 2019

Variant 35-154 Stein a.d. Traun

Building date: 13. May 2019

Construction project
Variant 35-154 Steinheim am Albuch

Building date: 03. September 2018

Construction project
Variant 35-154 Steißlingen

Building date: 20. August 2018

Construction project
Variant 35-154 Sulzbach-Rosenberg

Building date: 25. July 2018

Construction project
Variant 35-154 Tawern-Fellerich

Building date: 30. January 2019

Construction project
Variant 35-154 Teningen

Building date: 16. October 2018

Construction project
Variant 35-154 Thannhausen

Building date: 25. March 2019

Construction project
Variant 35-154 Theilheim

Building date: 12. June 2019

Construction project
Variant 35-154 Tiefenbach

Building date: 12. November 2018

Construction project
Variant 35-154 Traunwalchen

Building date: 21. June 2018

Variant 35-154 Traunwalchen

Building date: 18. October 2018

Construction project
Variant 35-154 Trimbs

Building date: 26. November 2018

Construction project
Variant 35-154 Trochtelfingen-Mägerkingen

Building date: 04. April 2019

Construction project
Variant 35-154 Tuntenhausen

Building date: 22. January 2019

Variant 35-154 Tuntenhausen

Building date: 07. November 2018

Construction project
Variant 35-154 Üdersdorf

Building date: 06. November 2018

Construction project
Variant 35-154 Ulm Ermingen

Building date: 15. April 2019

Construction project
Variant 35-154 Villenbach-Rischgau

Building date: 15. October 2018

Construction project
Variant 35-154 Volkmarsen

Building date: 13. December 2018

Construction project
Variant 35-154 Wangen-Oberwälden

Building date: 10. January 2019

Construction project
Variant 35-154 Wäschenbeuren

Building date: 13. May 2019

Construction project
Variant 35-154 Weiler

Building date: 24. June 2019

Construction project
Variant 35-154 Weingarten

Building date: 25. October 2018

Construction project
Variant 35-154 Weissenohe

Building date: 12. November 2018

Construction project
Variant 35-154 Wemding

Building date: 16. May 2019

Construction project
Variant 35-154 Wendelstein

Building date: 05. September 2018

Construction project
Variant 35-154 Wertach

Building date: 25. February 2019

Construction project
Variant 35-154 Wesseling

Building date: 27. August 2018

Villa 156 Wesseling

Building date: 19. March 2019

Construction project
Variant 35-154 Wetter

Building date: 22. October 2018

Construction project
Variant 35-154 Wiehl-Oberbantenberg

Building date: 05. September 2018

Construction project
Variant 35-154 Wiesbaden-Bierstadt

Building date: 23. April 2019

Construction project
Variant 35-154 Wildeshausen

Building date: 06. September 2018

Construction project
Variant 35-154 Wilhelmsfeld

Building date: 20. May 2019

Construction project
Variant 35-154 Willmenrod

Building date: 09. April 2019

Construction project
Variant 35-154 Willroth

Building date: 16. July 2018

Construction project
Variant 35-154 Winterberg

Building date: 25. April 2019

Construction project
Variant 35-154 Wollbach

Building date: 29. November 2018

Construction project
Variant 35-154 Wolsfeld

Building date: 28. November 2018

Construction project
Variant 35-154 Wülfershausen

Building date: 04. September 2018

Construction project
Variant 35-154 Wustrow (Wendland)

Building date: 11. March 2019

Construction project
Variant 35-154 Zahling

Building date: 10. October 2018

Construction project
Variant 35-154 Zell-Unterentersbach

Building date: 10. July 2018

Construction project
Variant 35-162 Dornburg

Building date: 11. July 2018

Construction project
Variant 35-162 Gädheim

Building date: 16. April 2019

Construction project
Variant 35-162 Kamp-Lintfort

Building date: 04. October 2018

Construction project
Variant 35-162 Melsungen-Schwarzenberg

Building date: 19. July 2018

Construction project
Variant 35-162 Michelstadt

Building date: 10. April 2019

Construction project
Variant 35-162 Reit im Winkl

Building date: 01. July 2019

Construction project
Variant 35-162 Rommerskirchen

Building date: 04. September 2018

Construction project
Variant 35-162 Walpertskirchen

Building date: 28. May 2019

Construction project
Variant 35-162 Zaisenhausen

Building date: 16. April 2019

Villa 183 Zaisenhausen

Building date: 08. April 2019

Construction project
Variant 35-173 Fahrenbach

Building date: 13. September 2018

Construction project
Variant 35-173 Fichtenberg

Building date: 09. May 2019

Construction project
Variant 35-173 Gau-Odernheim

Building date: 20. November 2018

Construction project
Variant 35-173 Gräfendorf

Building date: 21. June 2018

Variant 35-184 Gräfendorf

Building date: 26. February 2019

Construction project
Variant 35-173 Hamburg

Building date: 20. August 2018

Construction project
Variant 35-173 Krumbach-Billenhausen

Building date: 21. March 2019

Construction project
Variant 35-173 Leutershausen-Brunst

Building date: 11. October 2018

Construction project
Variant 35-173 Lindenschied

Building date: 14. August 2018

Construction project
Variant 35-173 Löwenstein

Building date: 03. April 2019

Construction project
Variant 35-173 Messel

Building date: 21. June 2018

Construction project
Variant 35-173 Neunkirchen-Seelscheid

Building date: 13. February 2019

Construction project
Variant 35-173 Nordkirchen

Building date: 18. July 2018

Variant 35-184 Nordkirchen

Building date: 19. February 2019

Construction project
Variant 35-173 Oberthulba-Frankenbrunn

Building date: 03. April 2019

Construction project
Variant 35-173 Radolfzell

Building date: 03. June 2019

Construction project
Variant 35-173 Recklinghausen

Building date: 13. June 2019

Construction project
Variant 35-173 Schönau

Building date: 19. March 2019

Construction project
Variant 35-173 Spessart

Building date: 21. May 2019

Construction project
Variant 35-173 Syrgenstein-Landshausen

Building date: 03. April 2019

Construction project
Variant 35-184 Alzenau

Building date: 28. May 2019

Construction project
Variant 35-184 Blankenfelde-Mahlow

Building date: 10. December 2018

Construction project
Variant 35-184 Dillenburg-Oberscheld

Building date: 05. December 2018

Construction project
Variant 35-184 Fellbach

Building date: 04. February 2019

Construction project
Variant 35-184 Großenlüder-Lütterz

Building date: 10. December 2018

Construction project
Variant 35-184 Höhn-Oellingen

Building date: 08. October 2018

Construction project
Variant 35-184 Kehl-Odelshofen

Building date: 25. March 2019

Construction project
Variant 35-184 Krefeld

Building date: 01. July 2019

Construction project
Variant 35-184 Neckarsteinach

Building date: 25. February 2019

Construction project
Variant 35-184 Oberndorf

Building date: 09. January 2019

Construction project
Variant 35-184 Rangsdorf

Building date: 23. July 2018

Construction project
Variant 35-184 Sanitz

Building date: 19. June 2019

Construction project
Variant 35-184 Schechingen

Building date: 13. December 2018

Construction project
Variant 35-184 Schotten-Rainrod

Building date: 16. April 2019

Construction project
Variant 35-184 Unterweid

Building date: 07. May 2019

Construction project
Variant 35-184 Velbert

Building date: 17. June 2019

Construction project
Variant 35-184 Wendelsheim

Building date: 19. September 2018

Construction project
Variant 35-184 Wittershausen

Building date: 18. June 2019

Construction project
Variant 35-235 Baden-Baden

Building date: 19. September 2018

Construction project
Variant 35-235 Lüdenscheid-Land

Building date: 14. May 2019

Construction project
Variant 35-235 Siegsdorf-Untersiegsdorf

Building date: 24. July 2018

Construction project
Variant 35-235 Sprockhövel-Hiddinghausen

Building date: 19. March 2019

Construction project
Variant 45-130 Unterroth

Building date: 16. August 2018

Construction project
Variant 45-145 Bad Honnef-Rottbitze

Building date: 02. July 2018

Construction project
Variant 45-145 Ehingen

Building date: 29. August 2018

Construction project
Variant 45-145 Frensdorf

Building date: 03. June 2019

Construction project
Variant 45-145 Goch

Building date: 20. February 2019

Construction project
Variant 45-145 Marxheim

Building date: 13. March 2019

Construction project
Variant 45-145 Teltow

Building date: 15. October 2018

Villa 183 Teltow

Building date: 18. July 2018

Construction project
Variant 45-145 Zülpich-Wichterich

Building date: 07. February 2019

Construction project
Variant 45-154 Bergtheim

Building date: 01. April 2019

Villa 142 Bergtheim

Building date: 11. July 2018

Construction project
Variant 45-154 Brackenheim-Haberschlacht

Building date: 07. January 2019

Construction project
Variant 45-154 Ratingen

Building date: 18. June 2019

Construction project
Variant 45-164 Bad Salzuflen

Building date: 21. May 2019

Construction project
Variant 45-164 Dormagen-Nievenheim

Building date: 27. March 2019

Construction project
Variant 45-164 Gründau-Gettenbach

Building date: 11. July 2018

Construction project
Variant 45-164 Leinach

Building date: 20. June 2018

Construction project
Variant 45-164 Lüdenscheid

Building date: 30. August 2018

Construction project
Variant 45-164 Puschendorf

Building date: 08. May 2019

Construction project
Variant 45-164 Wallhausen-Hengstfeld

Building date: 11. February 2019

Construction project
Variant 45-175 Bad Herrenalb

Building date: 01. September 2018

Construction project
Variant 45-175 Elfershausen

Building date: 24. April 2019

Construction project
Variant 45-175 Flegessen

Building date: 19. June 2019

Construction project
Variant 45-175 Hordorf-Cremlingen

Building date: 20. May 2019

Construction project
Variant 45-175 Lichtenau

Building date: 24. April 2019

Construction project
Variant 45-175 Nördlingen-Herkheim

Building date: 04. September 2018

Construction project
Variant 45-175 Strullendorf-Zeegendorf

Building date: 03. June 2019

Construction project
Variant 45-175 TA16 5AA, Merriott, Somerset

Building date: 05. February 2019

Vertriebsbüro Arnstein
Your contact person
  • Hofmann, Edwin

Untere Hornbergstraße 1, 97450 Arnstein

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Berlin
Your contact person
  • Jenrich, Thomas

Europaplatz 2 (8. Etage), 10557 Berlin

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Berlin
Your contact person
  • Köpping, Regina

Zellerfelder Straße 1, 13187 Berlin

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Berlin-Zehlendorf
Your contact person
  • Gratz, Guido

Machnower Straße 8, 14165 Berlin-Zehlendorf

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Bielefeld
Your contact person
  • Kemperdick, Joerg
  • Landmann, Stefan
  • Niggemann, Tobias

Carl-Severing-Straße 163, 33649 Bielefeld

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Chemnitz
Your contact person
  • Peukert, Monika

Amselweg 5, 09123 Chemnitz

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Chemnitz - Zschopau
Your contact person
  • Scheer, Christina

Zietenstraße 72, 09130 Chemnitz

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Dingolfing
Your contact person
  • Holzhauser, Josef
  • Schwab, Peter

Reisbacher Straße 28-30, 84130 Dingolfing

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Dresden
Your contact person
  • Horn, Uwe
  • Jäger-Horn, Elke

Leipziger Straße 93, 01127 Dresden

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Ebersbach-Bünzwangen
Your contact person
  • Rosenberger, Michael

Im Tal 11, 73061 Ebersbach-Bünzwangen

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Egham, Surrey
Your contact person
  • Sadler, Pete

Milland, Thorpe Leas Road, TW20 8JL Egham, Surrey

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Emmendingen
Your contact person
  • Kirchner, Jörg

Geranienstraße 2, 79312 Emmendingen

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Flensburg
Your contact person
  • Kasten, Peter
  • Thewes, Isabelle

Fliederbogen 18, 24944 Flensburg

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Fulda
Your contact person
  • Schulte, Matthias

Nonnengasse 3, 36037 Fulda

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Glienicke / Nordbahn
Your contact person
  • Kretschmer, Bernhard

Koebisstraße, 16548 Glienicke / Nordbahn

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Hamburg
Your contact person
  • Burmeister, Thomas

Christoph-Probst-Weg 41 (Hamburg Business Center Eppendorf GmbH), 20251 Hamburg

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Hove, East Sussex
Your contact person
  • Hawkey, Tony

75 Applesham Avenue, BN3 8JJ Hove, East Sussex

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Ingolstadt
Your contact person
  • Wild, Nadine

Oberringstr. 16, 85051 Ingolstadt

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Inverness
Your contact person
  • Wittke, Christian

Cragganard, Abriachan, IV3 8LB Inverness

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Königswinter
Your contact person
  • Florén-Sinzig, Wilfried
  • Sinzig, Elke

Technologiezentrum Siebengebirge, Eduard-Rhein-Straße 50, 53639 Königswinter

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Kriegstetten
Your contact person
  • Schärer, René

Längmattstraße 16, 4566 Kriegstetten

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Leegebruch/Oranienburg
Your contact person
  • Siebart, Bernd

Fohlenweide 68 A, 16767 Leegebruch/Oranienburg

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Leipzig
Your contact person
  • Löwenhagen, Karla

Beethovenstraße 14, 04107 Leipzig

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Memmingen
Your contact person
  • Oelmaier, Reinhold

Amendinger Straße 64, 87700 Memmingen

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Mies
Your contact person
  • Liardon, Serge

Route Suisse 9b, 1295 Mies

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Murr
Your contact person
  • Bernhart, Cornelia
  • Mineur, Yves

Ziegeleiweg 17/1, 71711 Murr

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Oberschweinbach
Your contact person
  • Herrmann, Michael

Am Rain 17a, 82294 Oberschweinbach

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Obertshausen
Your contact person
  • Ludwig, Gerda

Brunnenstraße 15, 63179 Obertshausen

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Pasewalk
Your contact person
  • Maske, Torsten

Feldstraße 17, 17309 Pasewalk

Opening hours: nach Vereinbarung

Building date: 18. January 2019

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Radolfzell-Böhringen
Your contact person
  • Blumer, Jochen

Föhrenweg 3, 78315 Radolfzell-Böhringen

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Ravensburg
Your contact person
  • Schmid, Dieter

Marktstraße 20, 88212 Ravensburg

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Reit im Winkl
Your contact person
  • Fuhrmann, Falko

Birnbacher Straße 5, 83242 Reit im Winkl

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Remich
Your contact person
  • Waschbüsch, Bärbel

Rue de Macher 31, 5550 Remich

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Schirmitz
Your contact person
  • Poremba, Helge Joachim

Weißdornweg 9, 92718 Schirmitz

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Simmern
Your contact person
  • Westphalen, Edmund

Johann-Philipp-Reis-Straße 13a, 55469 Simmern

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Sinsheim-Steinsfurt
Your contact person
  • Diener, Nico

Ansbachstraße 32a, 74889 Sinsheim-Steinsfurt

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Stroud, Gloucestershire
Your contact person
  • Gray, Peter

Beech House, Rodborough Common, Stroud, GL5 5DA Stroud, Gloucestershire

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Teignmouth, Devon
Your contact person
  • Slader, Matt

First Floor, Handel House, 2 Somerset Place, TQ14 8EP Teignmouth, Devon

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Ticino
Your contact person
  • Concu, Walter

Via Giueseppe Verdi 19, 20020 Busto Garolfo (MI)

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Trier
Your contact person
  • Westphalen, Edmund

Max-Planck-Straße 8, 54296 Trier

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Vaihingen-Enz
Your contact person
  • Stübbe, Karl

Lilo-Herrmann-Ring 52, 71665 Vaihingen-Enz

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Volketswil
Your contact person
  • Schilling, Alexander
  • Tomai, Stefania

Industriestrasse 18, 8604 Volketswil

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Vertriebsbüro Wiesbaden
Your contact person
  • Springer, Michael

Emser Straße 20, 65195 Wiesbaden

Opening hours: nach Vereinbarung

T +49 (0) 9741 808 409

.VCARD
Construction project
Villa 134 Euskirchen

Building date: 13. November 2018

Construction project
Villa 134 Frankfurt-Zeilsheim

Building date: 26. June 2019

Villa 183 Frankfurt am Main

Building date: 24. June 2019

Construction project
Villa 134 Königsbach-Stein

Building date: 12. June 2019

Construction project
Villa 142 Chavannes des Bois (VD)

Building date: 21. May 2019

Villa 142 Chavannes des Bois (VD)

Building date: 04. June 2019

Construction project
Villa 142 Grünsfeld

Building date: 24. October 2018

Construction project
Villa 142 Nenzlingen (BL)

Building date: 10. July 2018

Construction project
Villa 142 Rödermark-Urberach

Building date: 30. July 2018

Construction project
Villa 142 Willstätt-Sand

Building date: 02. April 2019

Construction project
Villa 156 Bochum-Hiltrop

Building date: 25. September 2018

Construction project
Villa 156 Burgthann

Building date: 14. May 2019

Construction project
Villa 156 Pfaffen-Schwabenheim

Building date: 26. February 2019

Construction project
Villa 156 Rimpar

Building date: 07. May 2019

Construction project
Villa 156 Schömberg

Building date: 11. February 2019

Construction project
Villa 156 Stangenroth

Building date: 19. November 2018

Construction project
Villa 165 Happurg

Building date: 17. June 2019

Construction project
Villa 165 Köln Porz-Langel

Building date: 08. October 2018

Construction project
Villa 165 Konstein

Building date: 03. June 2019

Construction project
Villa 165 Rödermark

Building date: 09. July 2018

Construction project
Villa 165 Staufenberg

Building date: 02. July 2018

Construction project
Villa 165 Thalmässing

Building date: 12. November 2018

Construction project
Villa 167 Berlin

Building date: 06. May 2019

Construction project
Villa 167 Güglingen

Building date: 05. June 2019

Construction project
Villa 167 Schemmerhofen-Altheim

Building date: 23. October 2018

Construction project
Villa 167 Schlierbach

Building date: 28. November 2018

Construction project
Villa 167 Wincheringen

Building date: 25. June 2019

Construction project
Villa 183 Bad Bocklet

Building date: 01. April 2019

Construction project
Villa 183 Bad Königshofen

Building date: 29. October 2018

Construction project
Villa 183 Burgwedel

Building date: 10. July 2018

Villa 183 Burgwedel

Building date: 25. July 2018

Construction project
Villa 183 Burscheid-Hilgen

Building date: 06. May 2019

Construction project
Villa 183 Calw-Wimberg

Building date: 26. March 2019

Construction project
Villa 183 Deißlingen-Lauffen

Building date: 12. June 2019

Construction project
Villa 183 Ebensfeld

Building date: 24. July 2018

Construction project
Villa 183 Ellwangen-Röhlingen

Building date: 17. July 2018

Construction project
Villa 183 Frensdorf-Obergreuth

Building date: 20. March 2019

Construction project
Villa 183 Geroldshausen

Building date: 26. June 2018

Construction project
Villa 183 Gerzen

Building date: 04. June 2019

Construction project
Villa 183 Gladbeck

Building date: 16. April 2019

Construction project
Villa 183 Großhabersdorf

Building date: 27. August 2018

Construction project
Villa 183 Güntersleben

Building date: 15. April 2019

Construction project
Villa 183 Hanau-Großauheim

Building date: 25. September 2018

Construction project
Villa 183 Heuchlingen

Building date: 29. October 2018

Construction project
Villa 183 Hohenroth

Building date: 08. January 2019

Construction project
Villa 183 Ihringen-Wasenweiler

Building date: 24. September 2018

Construction project
Villa 183 Königsfeld-Neuhausen

Building date: 29. January 2019

Construction project
Villa 183 Konstanz-Wollmatingen

Building date: 28. August 2018

Construction project
Villa 183 Manching-Oberstimm

Building date: 05. March 2019

Construction project
Villa 183 Meitingen - Erlingen

Building date: 25. June 2019

Construction project
Villa 183 Neubrunn

Building date: 11. March 2019

Construction project
Villa 183 Noréaz (FR)

Building date: 18. September 2018

Construction project
Villa 183 Rastatt-Plittersdorf

Building date: 25. June 2018

Construction project
Villa 183 Renquishausen

Building date: 12. June 2019

Construction project
Villa 183 Rüsselsheim

Building date: 08. October 2018

Construction project
Villa 183 Werneck-Zeuzleben

Building date: 26. June 2018

Construction project
Villa 207 Griesheim

Building date: 01. April 2019

Construction project
Villa 207 Somerton TA11 7JQ

Building date: 15. January 2019

Villingen-Schwenningen
Your contact person
  • Blumer, Jochen
  • Helzer, Alexej
  • Koscak, Danijela
  • Pervane, Semih
  • Schneider, Sandra

Messe 1 / Hs. 35, 78056 Villingen-Schwenningen

Opening hours: Mi. - So. 11-17 Uhr

Houses: Villa 177

T +49 (0) 9741 808 409

.VCARD
Construction project
Vita 138 Erlangen

Building date: 13. November 2018

Construction project
Vita 138 Salem-Beuren

Building date: 26. September 2018

Construction project
Vita 165 Groß-Umstadt

Building date: 12. March 2019

Vita 165 Groß-Umstadt

Building date: 24. October 2018

Construction project
Vita 165 Pottenstein

Building date: 13. November 2018

Construction project
Vita 180 Burglauer

Building date: 24. June 2019

Construction project
Vita 180 Kent, CT2 9BJ Canterbury

Building date: 23. October 2018

Wuppertal
Your contact person
  • Becker, Joachim
  • Berg, Michael
  • Latzel, Christoph
  • Stobbe, Tanja

Fertighauswelt, Parzelle 14, 42279 Wuppertal

Opening hours: Mi. - So. 11-18 Uhr

Houses: Variant 35-235

T +49 (0) 9741 808 409

.VCARD

Houses from
the same
series

Mehrfamilien Fertighaus von Hanse Haus
Duo 203
A urban villa that can be used in various ways: the prefabricated Duo 203 with two residential units
207 m²
DUO - Mehrfamilienhaus als Fertighaus von Hanse Haus
Duo 219
One for two with the two-family house Duo 219
223 m²
Mehrfamilien Fertighaus von Hanse Haus
Duo 315
Two families under one roof in the Duo 315 two-family house
264 m²
Hintergrundbild